Home / Projects / Midware Data Systems
Aviation · ★ Flagship Project

National Headquarters — Complete AV, LED & Lighting

One of the largest AV and LED integrations in Lebanon. Stage LED wall, outdoor advertising screen, Barco projectors, full audio and stage-lighting plus a lobby 4×3 videowall. Delivered 2018 and expanded in 2026, for Midware Data Systems’ national headquarters.

LED P1.8 7.2×3.85m Ticker 56m Barco Projectors Full Audio
Midware Data Systems stage LED wall, photo or video
Lobby 4x3 videowall, photo or video
Project Overview
Challenge, solution,
and results.
The Challenge
Midware Data Systems needed a national headquarters that could double as a flagship showcase: a stage and event space capable of hosting large-scale product launches and corporate events, an outdoor-facing advertising presence, and a lobby experience that made an immediate impression on visitors and partners — all coordinated as a single, reliable system rather than a patchwork of separate installs.
The Solution
Sectrom designed and delivered a fine-pitch P1.8 stage LED wall spanning 7.2 × 3.85 metres, paired with a 56-metre outdoor advertising ticker screen for building-wide visibility. Barco projectors and a full audio system were integrated for the main stage, complemented by professional stage lighting. In the lobby, a 4×3 videowall was installed as the centrepiece of the arrival experience, all tied into a single control workflow.
The Results
The system has been in continuous use since its original delivery in 2018, and was expanded in 2026 to extend its capabilities further — a sign of how well the original architecture has held up in daily operation. It remains one of the largest single AV and LED integrations completed by Sectrom in Lebanon, and continues to serve as the technical backbone for Midware Data Systems’ flagship events.
Scope of Work
What we delivered
end to end.
01
Fine-pitch P1.8 stage LED wall (7.2 × 3.85m) engineered for close-viewing clarity during live events and presentations.
02
56-metre outdoor advertising ticker screen for building-scale visibility, built to withstand continuous outdoor operation.
03
Barco projection, full audio, and stage lighting integrated into one coordinated event-production system.
04
A 4×3 lobby videowall serving as the visual centrepiece of the headquarters’ visitor arrival experience.
Delivered 2018, expanded 2026.
Get In Touch
Planning a similar
AV or LED project?

Tell us about your space. Our team will respond within 24 hours with a preliminary scope and proposal, no obligation.

Visit Us
Sin el Fil, Nas Center, 2nd Floor, Beirut
Call Us
+961 1 481 999